Frequently asked questions
What people ask most, from the first quote through to commissioning — permits, cost, output and maintenance.
How do I get a free quote?
Call +90 352 232 8 232 or fill in the contact form. Your address, the roof or land type and the past year's electricity bill are enough for us to prepare it. The quote is free, and you are under no obligation to continue afterwards.
What exactly do you do when preparing a quote?
We measure the roof or the land, note its orientation and tilt, and mark every shading source — chimneys, trees, neighbouring buildings, poles. On a roof we check the load capacity and the covering type; on land we check the soil and the clearances. We then read the past twelve months of bills with you and build your consumption profile. The quote and the report behind it are delivered in writing.
How long does installation take?
There are two separate timelines: installation and permitting. Installation varies with system size and roof type, and is usually the shortest step. What really sets the total duration is the distribution company's application and approval steps. With the quote we give you a written schedule specific to your project.
What are the steps of the installation process?
1) Free preliminary feasibility, 2) design and quote, 3) contract, 4) grid connection application and project approval with the distribution company, 5) equipment procurement, 6) mounting structure and panel installation, 7) electrical works and switchboard, 8) meter replacement, provisional acceptance and commissioning. Every step is carried out by our own team.
Is my roof suitable for solar?
Three things decide it: load capacity, orientation and tilt, and shading. Steep north-facing surfaces and areas shaded all day are inefficient. The age of the roof covering matters too — if the roof is due for renewal soon, it is better to renew it first rather than mount panels on it. The definitive answer comes with the quote.
I am a tenant — can I still have a system installed?
Installation and the grid application require the property owner's written consent. Net metering runs on the bill of whoever holds the electricity subscription. For long-term leases we discuss the scope of the written agreement with the owner while the quote is being prepared.
Do I need a permit to put panels on my roof?
Every grid-connected system requires a connection application to the distribution company; the plant cannot be commissioned before the call letter, project approval and connection agreement steps are complete. Additional approvals may be required depending on the building type and installed capacity. The documents and timeframes vary by distribution region and by the regulation in force, so we confirm them at the time of application.
Who handles the permits and paperwork?
We do. The connection application, the project file, correspondence with the distribution company, the meter replacement and the provisional acceptance are all on us. All we need from you are ownership documents such as the title deed, the subscription and your ID.
How does net metering work?
The energy you generate first covers your own consumption. The surplus is fed into the grid and offset on your bill under unlicensed generation rules. How the offset is calculated and how surplus generation is valued are set by the regulation in force — so instead of quoting figures up front, we check the current rules together at the time of application.
What is a bidirectional meter, and who installs it?
It is a meter that measures the energy you draw from the grid and the energy you feed into it separately; net metering rests on it. The distribution company performs the replacement, while we file and follow up the application.
How much does a system cost?
Cost is driven by installed capacity, roof or land type, the mounting structure, the inverter choice and the conditions of the grid connection. The same capacity comes out at different costs on two different roofs. That is why we do not publish a single price online; once we have assessed your site and your bills we prepare an itemised written quote.
How much will my electricity bill drop?
The reduction depends on the ratio of installed capacity to your consumption and on how that consumption is spread through the day. In businesses that operate during daylight hours a larger share of the generated energy is consumed directly, so the effect is bigger. Using the past twelve months of bills we produce a written annual generation estimate and bill impact with the quote.
What is the payback period?
Payback varies with your consumption, the unit price of electricity, the installed capacity, the site's solar irradiation and how you finance the investment. None of these is fixed, so we do not publish a generic figure. The quote gives you a range calculated from your own data.
What incentives and financing options are available?
The main channels are: VAT exemption and customs duty relief under an investment incentive certificate, subsidised loans for agricultural irrigation investments, SME support programmes, leasing, and bank investment loans. Conditions, rates and application windows change from period to period; while preparing the quote we check the current rules together to see which one fits you.
How can I pay?
We accept bank transfer and credit card, and payments can also be made through our online payment page. The payment plan is tied to project milestones in the contract and shared in writing together with the quote.
What is the difference between on-grid, off-grid and hybrid systems?
An on-grid system works connected to the grid; surplus generation is fed into the grid, and during an outage the system shuts down for safety. An off-grid system is independent of the grid and runs on batteries; it is preferred on land the grid does not reach and at irrigation sites. A hybrid system sits between the two: it is grid-connected but also has batteries, and keeps selected loads running during an outage. Which one suits you is decided by your consumption profile and your outage risk.
Do panels generate in winter and on cloudy days?
Yes, but less. Panels run on light and do not require direct sun; on an overcast day output falls. While snow covers the panel surface generation stops, and it resumes once the snow slides off. The annual generation estimate already accounts for seasonal variation — what matters is the yearly total, not any single day.
How long do panels last?
A panel has no moving parts; the real wear is the gradual decline of efficiency over the years. Manufacturers typically give a 25–30 year performance warranty, though the warranty curve and its conditions vary by brand. The quote states in writing which brand and model we use, along with the warranty period the manufacturer provides.
What does the inverter do?
It converts the direct current (DC) the panels generate into the alternating current (AC) used on site, and it also handles grid synchronisation and protection functions. It is the hardest-working part of the system, which is why brand and warranty period come before cost in the decision. Inverter logs are also the primary source for fault diagnosis.
Do I need batteries?
Not on a grid-connected rooftop plant; surplus energy is put to use by feeding it into the grid. Batteries make sense at facilities where an outage halts operations and on land the grid does not reach. Since they raise the system cost, we establish while preparing the quote whether the need is real.
How does the system work for agricultural irrigation?
The panels generate the electricity for the irrigation pump. On land with a grid connection the system is installed alongside the grid; where there is none it is fully independent. The design is driven by pump power, daily water demand, well depth and the irrigation calendar — so each project is built from that particular site's own data.
Is maintenance required, and how often?
Yes. Dust, bird droppings and agricultural dust cover the panel surface and output drops visibly. Cleaning frequency depends on the region, nearby dust sources and the panel tilt. We recommend at least one wash per year together with a periodic electrical inspection. Maintenance covers panel washing, structure and earthing checks, cable and connector checks, thermal camera scanning, and review of the inverter logs.
What does the warranty cover?
There are two separate warranties. The equipment warranty comes from the manufacturer, and the terms for panels, inverters and batteries vary by brand. The workmanship and installation warranty is ours. The duration of each is written out item by item in the quote and the contract — we do not make verbal warranty promises.
What happens if there is a fault?
Report it on +90 352 232 8 232 or at bilgi@direktenerji.com. We review the inverter logs and separate out what can be diagnosed remotely; if a site visit is needed we schedule it and get back to you. We keep spare parts in stock for inverters, panels and mounting structures, so you are not left waiting on procurement.
How do I monitor my generation?
Plants we install are followed through a monitoring screen: instantaneous and daily generation, inverter and device status, alerts, and comparison with previous periods. We hand over your access details at commissioning. Everything shown is the real measured data from your own plant.
Do you maintain systems installed by another company?
We do. On an existing plant we measure performance, identify the sources of loss, run a thermal camera scan and produce an improvement plan; a periodic maintenance agreement is also possible. A different brand is not an obstacle.
How long has Direkt Enerji been in business?
Since 2016 we have been designing, installing and maintaining solar power plants from our base in Kayseri. Every step from engineering to commissioning is carried out by our own engineering and installation staff.
Which regions do you serve?
Our head office is in Melikgazi, Kayseri. We carry out field work in Kayseri and the surrounding provinces. Tell us your address and we will tell you plainly whether we work in that area.
How can I reach you?
By phone on +90 352 232 8 232 or by email at bilgi@direktenerji.com. Our office is at Altınoluk Mah. Fatih Sultan Mehmet Blv. C Blok Tera City No: 29/A, 38120 Melikgazi/Kayseri. You can also fill in the form on the contact page and we will get back to you.
If your question is not here, call +90 352 232 8 232 or write to bilgi@direktenerji.com.
Let's settle what your site can hold — in writing.
We prepare the right system for your roof or land, with its cost, as a written quote.