Permits & regulation
Do I need a permit to put panels on my roof?
Every grid-connected system requires a connection application to the distribution company; the plant cannot be commissioned before the call letter, project approval and connection agreement steps are complete. Additional approvals may be required depending on the building type and installed capacity. The documents and timeframes vary by distribution region and by the regulation in force, so we confirm them at the time of application.
Who handles the permits and paperwork?
We do. The connection application, the project file, correspondence with the distribution company, the meter replacement and the provisional acceptance are all on us. All we need from you are ownership documents such as the title deed, the subscription and your ID.
How does net metering work?
The energy you generate first covers your own consumption. The surplus is fed into the grid and offset on your bill under unlicensed generation rules. How the offset is calculated and how surplus generation is valued are set by the regulation in force — so instead of quoting figures up front, we check the current rules together at the time of application.
What is a bidirectional meter, and who installs it?
It is a meter that measures the energy you draw from the grid and the energy you feed into it separately; net metering rests on it. The distribution company performs the replacement, while we file and follow up the application.
If your question is not here, call +90 352 232 8 232 or write to bilgi@direktenerji.com.
Let's settle what your site can hold — in writing.
We prepare the right system for your roof or land, with its cost, as a written quote.