How do I get a free quote?

Call +90 352 232 8 232 or fill in the contact form. Your address, the roof or land type and the past year's electricity bill are enough for us to prepare it. The quote is free, and you are under no obligation to continue afterwards.

What exactly do you do when preparing a quote?

We measure the roof or the land, note its orientation and tilt, and mark every shading source — chimneys, trees, neighbouring buildings, poles. On a roof we check the load capacity and the covering type; on land we check the soil and the clearances. We then read the past twelve months of bills with you and build your consumption profile. The quote and the report behind it are delivered in writing.

How long does installation take?

There are two separate timelines: installation and permitting. Installation varies with system size and roof type, and is usually the shortest step. What really sets the total duration is the distribution company's application and approval steps. With the quote we give you a written schedule specific to your project.

What are the steps of the installation process?

1) Free preliminary feasibility, 2) design and quote, 3) contract, 4) grid connection application and project approval with the distribution company, 5) equipment procurement, 6) mounting structure and panel installation, 7) electrical works and switchboard, 8) meter replacement, provisional acceptance and commissioning. Every step is carried out by our own team.

Is my roof suitable for solar?

Three things decide it: load capacity, orientation and tilt, and shading. Steep north-facing surfaces and areas shaded all day are inefficient. The age of the roof covering matters too — if the roof is due for renewal soon, it is better to renew it first rather than mount panels on it. The definitive answer comes with the quote.

I am a tenant — can I still have a system installed?

Installation and the grid application require the property owner's written consent. Net metering runs on the bill of whoever holds the electricity subscription. For long-term leases we discuss the scope of the written agreement with the owner while the quote is being prepared.

If your question is not here, call +90 352 232 8 232 or write to bilgi@direktenerji.com.